Day 1: Introduction to Hydropower, Design Codes, and Data Requirement
Day 1: Intro to Hydropower and Design Data59:38
Day 2 : Weir Rating Curve
Day 2: Weir Rating Curve1:01:28
Day 3: Weir Spillway Design
Day 3 Weir Spillway Design1:02:10
Day 4: Stilling Basin Design
Day 4: Stilling Basin Design56:09
Day 5: Weir Seepage and Cut-off
Day 5 Seepage and Cutoff1:00:54
Day 6: Seepage gradient line, river training, under-sluice and divide wall
Day 6: Seepage Gradient Line and River Training Works29:53
Day 6: Under-sluice and Divide Wall29:54
Day 7: Intake and Fish Ladder
Day 7: Intake35:58
Day 7: Fish Ladder36:54
Day 8: Settling Basin Design
Day 8: Settling Basin Theory38:44
Day 8: Settling Basin Design46:37
Day 9: Submergence, headrace pipe, canal, penstock pipe
Day 9: Submergence, Headrace Pipe, Canal, Penstock Pipe1:06:23
Day 10: Conceptualization of Different Projects
Day 10: Project Conceptualization – Part 149:36
Day 10: Project Conceptualization – Part 213:22
Day 11: Closing Session: Discussion and Feedback